Installation Location : Malaysia,
Installation Date : July 2025,
Project Overview : The system combines parking and waterproofing functions. Modules can be arranged in portrait or landscape orientation with a tilt angle of 0° to 15°. It withstands wind speeds up to 48 m/s and snow loads of ≥2.0 KN/m2. Made of hot-dip galvanized corrosion-resistant steel, it comes with a 10?year warranty and is suitable for commercial parking lots.

Leave A Message
Scan to Wechat :