Installation Location : Chiba Prefecture, Japan,
Installation Date : January 2026,
Project Overview : This containerized BESS energy storage mounting system is fabricated from carbon steel with hot-dip galvanized treatment. It delivers excellent load-bearing capacity and long-term durability for outdoor scenarios. The heavy-duty frame firmly supports the energy storage container, and the integrated walkway and stair structure facilitate routine inspection and maintenance. The rigid structure adapts to on-site ground conditions, offering a solid and stable foundation for containerized energy storage equipment.


Leave A Message
Scan to Wechat :