Installation Location : Osaki City, Miyagi Prefecture, Japan,
Installation Date : March 2026,
Project Overview : This project involves the installation of approximately 370 meters of grille fencing for power plant perimeter security. The fence features a vertical bar metal slat structure and supports both pile foundation and steel pipe foundation options. Its surface is treated with hot-dip galvanization, providing strong corrosion resistance. The fence is designed to withstand heavy winter snowfall and harsh weather conditions, ensuring long-term safety and stability around the plant perimeter.


Leave A Message
Scan to Wechat :