Installation Location : Hokkaido, Japan,
Installation Date : December 2023,
Project Overview : This project utilizes a high-strength steel ground-mounted racking system. The primary material is S350GD carbon steel, offering high strength and excellent corrosion resistance—ideal for the cold, snowy climate of Hokkaido. The system features a fully bolted structure, eliminating the need for complex components; beams and columns undergo extensive pre-assembly at the factory, ensuring efficient on-site installation and effectively reducing labor costs. The system is designed to withstand wind speeds of up to 48 m/s and snow loads of 4.0 kN/m².

Leave A Message
Scan to Wechat :