Installation Location: Hokkaido, Japan,
Installation Date: March 2023,
Project Overview: The project utilizes a high-strength steel ground-mounted racking system. Constructed from S350GD carbon steel, the system offers high strength and superior corrosion resistance, making it well-suited for the cold, snowy climate of Hokkaido. The structure employs bolted connections, eliminating the need for complex components; beams and columns are largely pre-assembled at the factory, ensuring efficient on-site installation and effectively reducing labor costs. The system is designed to withstand wind speeds of up to 48 m/s and snow loads of 4.0 kN/m².