Installation Location : Toyama Prefecture, Japan,
Installation Date : May 2023,
Project Overview : This project utilizes a high-strength steel ground mounting system. The brackets are made of S350GD carbon steel with hot-dip galvanized surface treatment, offering high strength and excellent corrosion resistance. The entire structure is connected with bolts, eliminating the need for complex accessories. Beams and posts are pre-assembled to the maximum extent before shipment, enabling convenient and efficient on-site installation while effectively reducing labor costs. The system can withstand wind speeds of up to 48m/s and snow loads of up to 4.0KN/m2.

Leave A Message
Scan to Wechat :