Installation Site : Japan,
Installation Date : March 2022,
Generating Capacity : 950 kWp,
Project Overview : This photovoltaic project adopts the single post ground mounting structure. The mounting frame is finished with hot-dip galvanization to deliver stable anti-corrosion performance, adapting well to the local climate conditions in Japan. The optimized single post layout is designed to reduce the quantity of components on site. It greatly simplifies construction work and supports rapid on-site assembly, cutting installation time and labor cost while maintaining solid structural stability for long-term PV operation.

Leave A Message
Scan to Wechat :