Installation Location : Italy,
Installation Date : June 2026,
Power Generation Capacity : 2MWp,
Project Overview : This 2MWp ground-mounted PV project in Italy utilizes a high-strength C-channel steel mounting system. Made of S350GD carbon steel, it offers excellent corrosion resistance and a long service life. The pre-drilled and bolted design enables rapid on-site assembly. The structure is highly stable, designed to withstand wind speeds of 25m/s and snow loads of 0.95kN/m2. It is also about 15% more cost-effective than aluminum alloy systems.


Leave A Message
Scan to Wechat :